Count: Takeoff Draft
Sheet 01 of 04Fixtures, devices, conduit, wire, feeders and gear counted from the plan set, every line tied to a sheet number and a spec section.
- Result
- Your estimator starts each bid by checking a drafted count instead of counting from blank sheets.
- Goes in
- The plan set and specs from the invitation to bid, plus your labor units.
- Comes out
- A line-by-line quantity sheet your estimator can key or import, grouped by system: lighting, power, feeders, gear, fire alarm, low voltage.
- Signed by
- Your estimator, who owns every quantity and every price.
Acceptance test: passes only if every line cites a sheet number and a spec section; a line missing either is pulled before delivery. The sample run also reports the share of your final line items the draft contained and lists every line it missed.
Full guide: Electrical takeoff Governed by check 1Next: Quote Leveling Sheet



