Electrical Bid Desk / Bid leveling
Bid Leveling for Electrical Supplier and Sub-Tier Quotes
Switchgear, generator, fire alarm and low voltage quotes never arrive against the same scope. One excludes startup and testing, another states a lead time with no ship date. Electrical Bid Desk levels them to one scope and flags every exclusion, so nothing drops out of your number.
Bid leveling
How the Quote Leveling Sheet works
- What it is
- Switchgear, generator, fire alarm and low voltage quotes side by side against one scope, with every exclusion and lead time flagged.
- Result
- No quote exclusion or stated lead time reaches your number unseen.
- Goes in
- The supplier and sub-tier quote PDFs you received for this bid.
- Comes out
- One sheet with each quote leveled to the same scope, exclusions listed per quote, and stated lead times next to the price.
- How it is checked
- Passes only if every exclusion and every stated lead time in every quote PDF appears on the sheet; one missing item fails the sheet and it is re-run.
- Rulebook check 2
- Every quote exclusion and every stated lead time appears on the leveling sheet.
- Signed by
- Your estimator, who picks the quote that goes into the number.
- Lead time is part of the price now: medium voltage switchgear runs about 22 months on 2026 orders (Archdesk, archdesk.com/blog/2026-us-data-center-construction, 2026-04-16).
- Every stated lead time lands next to its price on the sheet, and it feeds the Bid/No-Bid Score.
What it does not do. It does not pick the supplier or negotiate the quote. Your estimator picks the quote that goes into the number.
$7,500 setup, then $1,500 a month.
Sample run on one bid you already sent: $1,500. The sample run output is yours to keep and stands on its own. If you start setup within 30 days, the sample run price comes off setup in full.
Request a sample runRelated
Go deeper, one estimating job at a time

Electrical takeoff
Electrical Takeoff, Drafted Line by Line From Your Plan Set
Read the guide
Bid/no-bid
Bid/No-Bid Scoring for Electrical Contractors, With Every Input Sourced
Read the guide
Proposal assembly
Electrical Proposal Assembly: Inclusions, Exclusions and Clarifications in Your Format
Read the guide
Data center electrical estimating
Data Center Electrical Estimating: Why the Backlog Hits Hardest Here
Read the guide
Electrical Bid Desk
The four outputs, the five checks and the price
Read the guide